Make sure the substrate is perfectly sealed and that all hungry spots are addressed just before continuing to setup the program. If the overcoating time period with the primer is exceeded, the area needs to be lightly abraded and vacuumed just before additional coats are used. Registering with MyAltro enables https://mcgepoxycoatings.com/why-decorative-quartz-screed-works-wonders-for-hospitality-flooring/