1

High-Efficiency 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Project Highlight Newsome has efficiently finalised the installation and commissioning of a new 400 kW chiller at a leading confectionery manufacturing site in York. Designed to strengthen ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://bookmark-nation.com/story20546375/high-efficiency-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story